WEBVTT FILE 1 00:00:00.100 --> 00:00:04.337 The Roman Space Telescope’s primary structure is ready for the wire harness 2 00:00:04.537 --> 00:00:07.741 that powers each system of instruments, gyroscopes, 3 00:00:07.941 --> 00:00:11.144 data transfer and movement. 4 00:00:11.144 --> 00:00:13.413 But the harness is nearly 1,000 pounds 5 00:00:14.280 --> 00:00:16.850 and 45 miles of continuous wiring. 6 00:00:17.617 --> 00:00:21.054 This acts as the central nervous system of the whole observatory 7 00:00:21.388 --> 00:00:25.592 and, like our nerves is threaded through each major component, 8 00:00:25.792 --> 00:00:28.862 making its transfer a delicate operation. 9 00:00:32.932 --> 00:00:35.101 What we're doing today is we're taking 10 00:00:35.668 --> 00:00:38.371 the flight harness off of the mockup 11 00:00:38.371 --> 00:00:41.007 that was used to put it in that flight configuration, 12 00:00:41.508 --> 00:00:44.110 and we're putting it on the harness transfer tool, 13 00:00:44.544 --> 00:00:47.213 which will then be used to pick up the flight harness 14 00:00:47.514 --> 00:00:52.419 and put it into the flight structure to then be put and mounted 15 00:00:52.419 --> 00:01:09.169 on all the flight hardware and then eventually flown into space. 16 00:01:13.106 --> 00:01:13.740 Each side 17 00:01:13.740 --> 00:01:16.109 of the primary structure houses different systems, 18 00:01:16.776 --> 00:01:19.446 each with redundant parts of wiring options. 19 00:01:20.747 --> 00:01:23.516 Yes. So this is the telescope electronics. 20 00:01:24.784 --> 00:01:28.321 And over here before this is before. 21 00:01:28.321 --> 00:01:29.856 It's still being completed. 22 00:01:29.856 --> 00:01:34.994 The system command data handling this is the kind of the brains of the spacecraft. 23 00:01:36.129 --> 00:01:38.398 With the wiring in place and tested. 24 00:01:38.398 --> 00:01:42.202 The team will continue installing all the components into the primary structure 25 00:01:42.402 --> 00:01:46.039 over the course of the next year.