1 00:00:01,070 --> 00:00:05,070 music 2 00:00:05,070 --> 00:00:12,000 Technicians successfully test James Webb Space Telescope’s Deployable Tower Assembly. 3 00:00:12,000 --> 00:00:16,000 This tower creates a 4-foot (1.2 meter) gap between Webb’s mirror and science segment and it’s sunshield and spacecraft bus segment. 4 00:00:16,000 --> 00:00:23,000 This gap allows Webb’s active and passive cooling systems to cool its mirrors and sensors down to super cold temperatures. 5 00:00:23,000 --> 00:00:32,710 Mirrors and instruments need to be super cold for Webb to perform its science. 6 00:00:32,710 --> 00:00:37,000 A special pulley and counterbalance system perfectly offset the weight of Webb’s mirrors and instrument segment 7 00:00:37,000 --> 00:00:44,000 Canceling the effects of Earth’s gravity for this test. The tower slowly extended upward over the course of several hours. 8 00:00:44,000 --> 00:00:51,720 This is the same maneuver it will perform once in space. NASA’s James Webb Space Telescope will be the world’s premier space science observatory when it launches. 9 00:00:51,720 --> 00:00:58,000 Webb is an international program led by NASA with its partners, the European Space Agency and the Canadian Space Agency. 10 00:00:58,000 --> 00:01:00,075 music