{
    "count": 3,
    "next": null,
    "previous": null,
    "results": [
        {
            "id": 10436,
            "url": "https://svs.gsfc.nasa.gov/10436/",
            "result_type": "Produced Video",
            "release_date": "2009-05-12T00:00:00-04:00",
            "title": "Making Hubble More Powerful",
            "description": "The Hubble Space Telescope would not be able to produce its breathtaking science without the upgraded infrastructure targeted during the HST SM4 mission: Fine Guidance Sensor, Scientific Instrument Command and Data Handling, Soft Capture Mechanism, Batteries, and New Outer Blanket Layers. Along with all new cameras, scientific instruments, the Hubble telescope will work better than it ever has in its lifetime. || ",
            "hits": 30
        },
        {
            "id": 10235,
            "url": "https://svs.gsfc.nasa.gov/10235/",
            "result_type": "Produced Video",
            "release_date": "2008-08-22T00:00:00-04:00",
            "title": "HST SM4 Hubble Deploy",
            "description": "Animation showing the release of the Hubble Space telescope after the completion of Servicing Mission 4. || ",
            "hits": 127
        },
        {
            "id": 10271,
            "url": "https://svs.gsfc.nasa.gov/10271/",
            "result_type": "Produced Video",
            "release_date": "2008-08-19T00:00:00-04:00",
            "title": "HST SM4 - Change Out Animation",
            "description": "Animation shows the change out of instruments and hardware planned during the Hubble Servicing Mission 4. The instrument change out order in the animation order is as follows: 1. Battery replacement  2. Wide Field Planetary Camera replaced with new Wide Field Camera 3 (WFC3) 3. Rate Sensor Units replaced (contain 2 gyros each) 4. COSTAR instrument replaced with new Cosmic Origins Spectrograph (COS)  5. Advanced Camera for Surveys (ACS) repair (circuit boards replaced and new power box added)  6. Space Telescope Imaging Spectrograph repair (cover removed, circuit board replaced, new main electronics box cover added)  7. Fine Guidance Sensor replaced 8. Soft Capture Mechanism added || ",
            "hits": 24
        }
    ]
}