{
    "id": 12115,
    "url": "https://svs.gsfc.nasa.gov/12115/",
    "page_type": "Produced Video",
    "title": "Sen. Barbara Mikulski Visit To Goddard Jan. 6, 2016",
    "description": "B-roll of includes: Senator Mikulski views the James Webb Space Telescope being assembled in a clean room at Goddard. Webb project manager Bill Oches talked to the Senator about the progress being made with the installation of its 18 primary mirrors. The James Webb Space Telescope is the scientific successor to NASA's Hubble Space Telescope. Next Senator Mikulski participated in a ribbon cutting to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office. Goddard Center director Chris Scolese and Satellite Servicing Capabilities Office (SSCO) Associate Director Frank Cepollina stood next to the Senator as she cut the ribbon. SSCO Deputy Project Manager Ben Reed showed Mikulski around the ROC where they saw a demonstration of the robotic technology. || mikulski_sitting.png (1964x1296) [3.5 MB] || mikulski_sitting_print.jpg (1024x675) [131.9 KB] || Screen_Shot_2016-01-04_at_5.02.53_PM_searchweb.png (320x180) [111.0 KB] || mikulski_sitting_web.png (320x211) [123.8 KB] || mikulski_sitting_thm.png (80x40) [11.0 KB] || GSFC_Mikulski_Broll.mov (1280x720) [4.7 GB] || WEBM_GSFC_Mikulski_Broll.webm (960x540) [129.9 MB] || ",
    "release_date": "2016-01-04T16:00:00-05:00",
    "update_date": "2023-05-03T13:48:59.731634-04:00",
    "main_image": {
        "id": 436332,
        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Mikulski_Gunn6.jpg",
        "filename": "Mikulski_Gunn6.jpg",
        "media_type": "Image",
        "alt_text": "Sen. Barbara Mikulski participated in a ribbon cutting at NASA’s Goddard Space Flight Center on January 6th, 2016, to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office. Within the ROC's black walls, NASA is testing technologies and operational procedures for science and exploration missions, including the Restore-L satellite servicing mission and also the Asteroid Redirect Mission. \rImage credit: NASA/Chris Gunn\r",
        "width": 4928,
        "height": 3280,
        "pixels": 16163840
    },
    "main_video": {
        "id": 436314,
        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/GSFC_Mikulski_Broll.mov",
        "filename": "GSFC_Mikulski_Broll.mov",
        "media_type": "Movie",
        "alt_text": "B-roll of includes: Senator Mikulski views the James Webb Space Telescope being assembled in a clean room at Goddard. Webb project manager Bill Oches talked to the Senator about the progress being made with the installation of its 18 primary mirrors. The James Webb Space Telescope is the scientific successor to NASA's Hubble Space Telescope. Next Senator Mikulski participated in a ribbon cutting to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office. Goddard Center director Chris Scolese and Satellite Servicing Capabilities Office (SSCO) Associate Director Frank Cepollina stood next to the Senator as she cut the ribbon. SSCO Deputy Project Manager Ben Reed showed Mikulski around the ROC where they saw a demonstration of the robotic technology. ",
        "width": 1280,
        "height": 720,
        "pixels": 921600
    },
    "main_credits": {
        "Produced by": [
            {
                "name": "Michelle Handleman",
                "employer": "USRA"
            }
        ],
        "Edited by": [
            {
                "name": "Michael Randazzo",
                "employer": "Advocates in Manpower Management, Inc."
            }
        ],
        "Videography": [
            {
                "name": "John Caldwell",
                "employer": "Advocates in Manpower Management, Inc."
            },
            {
                "name": "Michael McClare",
                "employer": "HTSI"
            }
        ]
    },
    "progress": "Complete",
    "media_groups": [
        {
            "id": 335337,
            "url": "https://svs.gsfc.nasa.gov/12115/#media_group_335337",
            "widget": "Video player",
            "title": "",
            "caption": "",
            "description": "B-roll of includes: <p><p>Senator Mikulski views the James Webb Space Telescope being assembled in a clean room at Goddard. Webb project manager Bill Oches talked to the Senator about the progress being made with the installation of its 18 primary mirrors. The James Webb Space Telescope is the scientific successor to NASA's Hubble Space Telescope. <p><p>Next Senator Mikulski participated in a ribbon cutting to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office. Goddard Center director Chris Scolese and Satellite Servicing Capabilities Office (SSCO) Associate Director Frank Cepollina stood next to the Senator as she cut the ribbon. SSCO Deputy Project Manager Ben Reed showed Mikulski around the ROC where they saw a demonstration of the robotic technology. ",
            "items": [
                {
                    "id": 273692,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436316,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/mikulski_sitting.png",
                        "filename": "mikulski_sitting.png",
                        "media_type": "Image",
                        "alt_text": "B-roll of includes: Senator Mikulski views the James Webb Space Telescope being assembled in a clean room at Goddard. Webb project manager Bill Oches talked to the Senator about the progress being made with the installation of its 18 primary mirrors. The James Webb Space Telescope is the scientific successor to NASA's Hubble Space Telescope. Next Senator Mikulski participated in a ribbon cutting to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office. Goddard Center director Chris Scolese and Satellite Servicing Capabilities Office (SSCO) Associate Director Frank Cepollina stood next to the Senator as she cut the ribbon. SSCO Deputy Project Manager Ben Reed showed Mikulski around the ROC where they saw a demonstration of the robotic technology. ",
                        "width": 1964,
                        "height": 1296,
                        "pixels": 2545344
                    }
                },
                {
                    "id": 273693,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436317,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/mikulski_sitting_print.jpg",
                        "filename": "mikulski_sitting_print.jpg",
                        "media_type": "Image",
                        "alt_text": "B-roll of includes: Senator Mikulski views the James Webb Space Telescope being assembled in a clean room at Goddard. Webb project manager Bill Oches talked to the Senator about the progress being made with the installation of its 18 primary mirrors. The James Webb Space Telescope is the scientific successor to NASA's Hubble Space Telescope. Next Senator Mikulski participated in a ribbon cutting to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office. Goddard Center director Chris Scolese and Satellite Servicing Capabilities Office (SSCO) Associate Director Frank Cepollina stood next to the Senator as she cut the ribbon. SSCO Deputy Project Manager Ben Reed showed Mikulski around the ROC where they saw a demonstration of the robotic technology. ",
                        "width": 1024,
                        "height": 675,
                        "pixels": 691200
                    }
                },
                {
                    "id": 273691,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436315,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Screen_Shot_2016-01-04_at_5.02.53_PM_searchweb.png",
                        "filename": "Screen_Shot_2016-01-04_at_5.02.53_PM_searchweb.png",
                        "media_type": "Image",
                        "alt_text": "B-roll of includes: Senator Mikulski views the James Webb Space Telescope being assembled in a clean room at Goddard. Webb project manager Bill Oches talked to the Senator about the progress being made with the installation of its 18 primary mirrors. The James Webb Space Telescope is the scientific successor to NASA's Hubble Space Telescope. Next Senator Mikulski participated in a ribbon cutting to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office. Goddard Center director Chris Scolese and Satellite Servicing Capabilities Office (SSCO) Associate Director Frank Cepollina stood next to the Senator as she cut the ribbon. SSCO Deputy Project Manager Ben Reed showed Mikulski around the ROC where they saw a demonstration of the robotic technology. ",
                        "width": 320,
                        "height": 180,
                        "pixels": 57600
                    }
                },
                {
                    "id": 273694,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436318,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/mikulski_sitting_web.png",
                        "filename": "mikulski_sitting_web.png",
                        "media_type": "Image",
                        "alt_text": "B-roll of includes: Senator Mikulski views the James Webb Space Telescope being assembled in a clean room at Goddard. Webb project manager Bill Oches talked to the Senator about the progress being made with the installation of its 18 primary mirrors. The James Webb Space Telescope is the scientific successor to NASA's Hubble Space Telescope. Next Senator Mikulski participated in a ribbon cutting to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office. Goddard Center director Chris Scolese and Satellite Servicing Capabilities Office (SSCO) Associate Director Frank Cepollina stood next to the Senator as she cut the ribbon. SSCO Deputy Project Manager Ben Reed showed Mikulski around the ROC where they saw a demonstration of the robotic technology. ",
                        "width": 320,
                        "height": 211,
                        "pixels": 67520
                    }
                },
                {
                    "id": 273695,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436319,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/mikulski_sitting_thm.png",
                        "filename": "mikulski_sitting_thm.png",
                        "media_type": "Image",
                        "alt_text": "B-roll of includes: Senator Mikulski views the James Webb Space Telescope being assembled in a clean room at Goddard. Webb project manager Bill Oches talked to the Senator about the progress being made with the installation of its 18 primary mirrors. The James Webb Space Telescope is the scientific successor to NASA's Hubble Space Telescope. Next Senator Mikulski participated in a ribbon cutting to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office. Goddard Center director Chris Scolese and Satellite Servicing Capabilities Office (SSCO) Associate Director Frank Cepollina stood next to the Senator as she cut the ribbon. SSCO Deputy Project Manager Ben Reed showed Mikulski around the ROC where they saw a demonstration of the robotic technology. ",
                        "width": 80,
                        "height": 40,
                        "pixels": 3200
                    }
                },
                {
                    "id": 273690,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436314,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/GSFC_Mikulski_Broll.mov",
                        "filename": "GSFC_Mikulski_Broll.mov",
                        "media_type": "Movie",
                        "alt_text": "B-roll of includes: Senator Mikulski views the James Webb Space Telescope being assembled in a clean room at Goddard. Webb project manager Bill Oches talked to the Senator about the progress being made with the installation of its 18 primary mirrors. The James Webb Space Telescope is the scientific successor to NASA's Hubble Space Telescope. Next Senator Mikulski participated in a ribbon cutting to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office. Goddard Center director Chris Scolese and Satellite Servicing Capabilities Office (SSCO) Associate Director Frank Cepollina stood next to the Senator as she cut the ribbon. SSCO Deputy Project Manager Ben Reed showed Mikulski around the ROC where they saw a demonstration of the robotic technology. ",
                        "width": 1280,
                        "height": 720,
                        "pixels": 921600
                    }
                },
                {
                    "id": 273696,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436320,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/WEBM_GSFC_Mikulski_Broll.webm",
                        "filename": "WEBM_GSFC_Mikulski_Broll.webm",
                        "media_type": "Movie",
                        "alt_text": "B-roll of includes: Senator Mikulski views the James Webb Space Telescope being assembled in a clean room at Goddard. Webb project manager Bill Oches talked to the Senator about the progress being made with the installation of its 18 primary mirrors. The James Webb Space Telescope is the scientific successor to NASA's Hubble Space Telescope. Next Senator Mikulski participated in a ribbon cutting to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office. Goddard Center director Chris Scolese and Satellite Servicing Capabilities Office (SSCO) Associate Director Frank Cepollina stood next to the Senator as she cut the ribbon. SSCO Deputy Project Manager Ben Reed showed Mikulski around the ROC where they saw a demonstration of the robotic technology. ",
                        "width": 960,
                        "height": 540,
                        "pixels": 518400
                    }
                }
            ],
            "extra_data": {}
        },
        {
            "id": 335336,
            "url": "https://svs.gsfc.nasa.gov/12115/#media_group_335336",
            "widget": "Basic text with HTML",
            "title": "",
            "caption": "",
            "description": "Sen. Barbara Mikulski spoke with employees at NASA's Goddard Space Flight Center on January 6th, 2016. <br><br>The Senator also participated in a ribbon cutting to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office (SSCO). Within the ROC's black walls, NASA is testing technologies and operational procedures for science and exploration missions, including the Restore-L satellite servicing mission and also the Asteroid Redirect Mission.  \r<br>\r<br>During her tour of the ROC, Sen. Mikulski saw first-hand an early version of the NASA Servicing Arm, a 2-meter-class robot with the dexterity to grasp and refuel a satellite on orbit. She also heard a description of Raven, a payload launching to the International Space Station that will demonstrate real-time, relative space navigation technology.  The robotic technologies that NASA is developing within the ROC also support the Journey to Mars.<br><br>Learn more about NASA’s <a href=\"http://ssco.gsfc.nasa.gov/\" target=\"_blank\">SATELLITE SERVICING CAPABILITIES OFFICE.</a><br><br>See more still images<a href=\"https://www.flickr.com/photos/gsfc/albums/72157663075373412\"  target=\"_blank\"> HERE.</a>",
            "items": [],
            "extra_data": {}
        },
        {
            "id": 335338,
            "url": "https://svs.gsfc.nasa.gov/12115/#media_group_335338",
            "widget": "Video player",
            "title": "",
            "caption": "",
            "description": "Sen. Barbara Mikulski speaks to employees at the Goddard Space Flight Center on January 6th, 2016. ",
            "items": [
                {
                    "id": 273700,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436324,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Screen_Shot_2016-01-06_at_1.44.23_PM_print.jpg",
                        "filename": "Screen_Shot_2016-01-06_at_1.44.23_PM_print.jpg",
                        "media_type": "Image",
                        "alt_text": "Sen. Barbara Mikulski speaks to employees at the Goddard Space Flight Center on January 6th, 2016. ",
                        "width": 1024,
                        "height": 564,
                        "pixels": 577536
                    }
                },
                {
                    "id": 273699,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436323,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Screen_Shot_2016-01-06_at_1.44.23_PM.png",
                        "filename": "Screen_Shot_2016-01-06_at_1.44.23_PM.png",
                        "media_type": "Image",
                        "alt_text": "Sen. Barbara Mikulski speaks to employees at the Goddard Space Flight Center on January 6th, 2016. ",
                        "width": 928,
                        "height": 512,
                        "pixels": 475136
                    }
                },
                {
                    "id": 273701,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436325,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Screen_Shot_2016-01-06_at_1.44.23_PM_web.png",
                        "filename": "Screen_Shot_2016-01-06_at_1.44.23_PM_web.png",
                        "media_type": "Image",
                        "alt_text": "Sen. Barbara Mikulski speaks to employees at the Goddard Space Flight Center on January 6th, 2016. ",
                        "width": 320,
                        "height": 176,
                        "pixels": 56320
                    }
                },
                {
                    "id": 273697,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436321,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/1.6.16_Mikulski_visit.mov",
                        "filename": "1.6.16_Mikulski_visit.mov",
                        "media_type": "Movie",
                        "alt_text": "Sen. Barbara Mikulski speaks to employees at the Goddard Space Flight Center on January 6th, 2016. ",
                        "width": 1280,
                        "height": 720,
                        "pixels": 921600
                    }
                },
                {
                    "id": 273698,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436322,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/1.6.16_Mikulski_low_res.mp4",
                        "filename": "1.6.16_Mikulski_low_res.mp4",
                        "media_type": "Movie",
                        "alt_text": "Sen. Barbara Mikulski speaks to employees at the Goddard Space Flight Center on January 6th, 2016. ",
                        "width": 1280,
                        "height": 720,
                        "pixels": 921600
                    }
                },
                {
                    "id": 273702,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436326,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/1.6.16_Mikulski_visit.webm",
                        "filename": "1.6.16_Mikulski_visit.webm",
                        "media_type": "Movie",
                        "alt_text": "Sen. Barbara Mikulski speaks to employees at the Goddard Space Flight Center on January 6th, 2016. ",
                        "width": 1280,
                        "height": 720,
                        "pixels": 921600
                    }
                }
            ],
            "extra_data": {}
        },
        {
            "id": 335339,
            "url": "https://svs.gsfc.nasa.gov/12115/#media_group_335339",
            "widget": "Single image",
            "title": "",
            "caption": "",
            "description": "Sen. Barbara Mikulski participated in a ribbon cutting at NASA’s Goddard Space Flight Center on January 6th, 2016, to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office (SSCO). Here, she receives an overview of a robotic console station used to practice satellite servicing activities.<p>\r<p>Image credit: NASA/Chris Gunn\r<p>",
            "items": [
                {
                    "id": 273704,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436328,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Mikulski_Gunn7_print.jpg",
                        "filename": "Mikulski_Gunn7_print.jpg",
                        "media_type": "Image",
                        "alt_text": "Sen. Barbara Mikulski participated in a ribbon cutting at NASA’s Goddard Space Flight Center on January 6th, 2016, to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office (SSCO). Here, she receives an overview of a robotic console station used to practice satellite servicing activities.\rImage credit: NASA/Chris Gunn\r",
                        "width": 1024,
                        "height": 681,
                        "pixels": 697344
                    }
                },
                {
                    "id": 273703,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436327,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Mikulski_Gunn7.jpg",
                        "filename": "Mikulski_Gunn7.jpg",
                        "media_type": "Image",
                        "alt_text": "Sen. Barbara Mikulski participated in a ribbon cutting at NASA’s Goddard Space Flight Center on January 6th, 2016, to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office (SSCO). Here, she receives an overview of a robotic console station used to practice satellite servicing activities.\rImage credit: NASA/Chris Gunn\r",
                        "width": 3740,
                        "height": 2488,
                        "pixels": 9305120
                    }
                },
                {
                    "id": 273705,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436329,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Mikulski_Gunn7_web.png",
                        "filename": "Mikulski_Gunn7_web.png",
                        "media_type": "Image",
                        "alt_text": "Sen. Barbara Mikulski participated in a ribbon cutting at NASA’s Goddard Space Flight Center on January 6th, 2016, to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office (SSCO). Here, she receives an overview of a robotic console station used to practice satellite servicing activities.\rImage credit: NASA/Chris Gunn\r",
                        "width": 320,
                        "height": 212,
                        "pixels": 67840
                    }
                }
            ],
            "extra_data": {}
        },
        {
            "id": 335340,
            "url": "https://svs.gsfc.nasa.gov/12115/#media_group_335340",
            "widget": "Single image",
            "title": "",
            "caption": "",
            "description": "Sen. Barbara Mikulski participated in a ribbon cutting at NASA’s Goddard Space Flight Center on January 6th, 2016, to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office. Within the ROC's black walls, NASA is testing technologies and operational procedures for science and exploration missions, including the Restore-L satellite servicing mission and also the Asteroid Redirect Mission. \r<p><p>Image credit: NASA/Chris Gunn\r<p>",
            "items": [
                {
                    "id": 273706,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436332,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Mikulski_Gunn6.jpg",
                        "filename": "Mikulski_Gunn6.jpg",
                        "media_type": "Image",
                        "alt_text": "Sen. Barbara Mikulski participated in a ribbon cutting at NASA’s Goddard Space Flight Center on January 6th, 2016, to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office. Within the ROC's black walls, NASA is testing technologies and operational procedures for science and exploration missions, including the Restore-L satellite servicing mission and also the Asteroid Redirect Mission. \rImage credit: NASA/Chris Gunn\r",
                        "width": 4928,
                        "height": 3280,
                        "pixels": 16163840
                    }
                },
                {
                    "id": 273707,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436330,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Mikulski_Gunn6_searchweb.png",
                        "filename": "Mikulski_Gunn6_searchweb.png",
                        "media_type": "Image",
                        "alt_text": "Sen. Barbara Mikulski participated in a ribbon cutting at NASA’s Goddard Space Flight Center on January 6th, 2016, to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office. Within the ROC's black walls, NASA is testing technologies and operational procedures for science and exploration missions, including the Restore-L satellite servicing mission and also the Asteroid Redirect Mission. \rImage credit: NASA/Chris Gunn\r",
                        "width": 320,
                        "height": 180,
                        "pixels": 57600
                    }
                },
                {
                    "id": 273708,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436331,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Mikulski_Gunn6_thm.png",
                        "filename": "Mikulski_Gunn6_thm.png",
                        "media_type": "Image",
                        "alt_text": "Sen. Barbara Mikulski participated in a ribbon cutting at NASA’s Goddard Space Flight Center on January 6th, 2016, to officially open the new Robotic Operations Center (ROC) developed by the Satellite Servicing Capabilities Office. Within the ROC's black walls, NASA is testing technologies and operational procedures for science and exploration missions, including the Restore-L satellite servicing mission and also the Asteroid Redirect Mission. \rImage credit: NASA/Chris Gunn\r",
                        "width": 80,
                        "height": 40,
                        "pixels": 3200
                    }
                }
            ],
            "extra_data": {}
        },
        {
            "id": 335341,
            "url": "https://svs.gsfc.nasa.gov/12115/#media_group_335341",
            "widget": "Single image",
            "title": "",
            "caption": "",
            "description": "During her tour of the ROC, Sen. Mikulski saw first-hand an early version of the NASA Servicing Arm (visible above, at right), a 2-meter-class robot with the dexterity to grasp and refuel a satellite on orbit. She also heard a description of Raven, a payload launching to the International Space Station that will demonstrate real-time, relative space navigation technology.  The robotic technologies that NASA is developing within the ROC also support the Journey to Mars.\r<p>\r<p>Image credit: NASA/Desiree Stover\r<p>",
            "items": [
                {
                    "id": 273710,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436334,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Mikulski_Stover0004_print.jpg",
                        "filename": "Mikulski_Stover0004_print.jpg",
                        "media_type": "Image",
                        "alt_text": "During her tour of the ROC, Sen. Mikulski saw first-hand an early version of the NASA Servicing Arm (visible above, at right), a 2-meter-class robot with the dexterity to grasp and refuel a satellite on orbit. She also heard a description of Raven, a payload launching to the International Space Station that will demonstrate real-time, relative space navigation technology.  The robotic technologies that NASA is developing within the ROC also support the Journey to Mars.\r\rImage credit: NASA/Desiree Stover\r",
                        "width": 1024,
                        "height": 681,
                        "pixels": 697344
                    }
                },
                {
                    "id": 273709,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436333,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Mikulski_Stover0004.jpg",
                        "filename": "Mikulski_Stover0004.jpg",
                        "media_type": "Image",
                        "alt_text": "During her tour of the ROC, Sen. Mikulski saw first-hand an early version of the NASA Servicing Arm (visible above, at right), a 2-meter-class robot with the dexterity to grasp and refuel a satellite on orbit. She also heard a description of Raven, a payload launching to the International Space Station that will demonstrate real-time, relative space navigation technology.  The robotic technologies that NASA is developing within the ROC also support the Journey to Mars.\r\rImage credit: NASA/Desiree Stover\r",
                        "width": 2880,
                        "height": 1917,
                        "pixels": 5520960
                    }
                },
                {
                    "id": 273711,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436335,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Mikulski_Stover0004_web.png",
                        "filename": "Mikulski_Stover0004_web.png",
                        "media_type": "Image",
                        "alt_text": "During her tour of the ROC, Sen. Mikulski saw first-hand an early version of the NASA Servicing Arm (visible above, at right), a 2-meter-class robot with the dexterity to grasp and refuel a satellite on orbit. She also heard a description of Raven, a payload launching to the International Space Station that will demonstrate real-time, relative space navigation technology.  The robotic technologies that NASA is developing within the ROC also support the Journey to Mars.\r\rImage credit: NASA/Desiree Stover\r",
                        "width": 320,
                        "height": 213,
                        "pixels": 68160
                    }
                }
            ],
            "extra_data": {}
        },
        {
            "id": 335342,
            "url": "https://svs.gsfc.nasa.gov/12115/#media_group_335342",
            "widget": "Video player",
            "title": "",
            "caption": "",
            "description": "Impromptu speech following the ribbon cutting of the Robotic Operations Center (ROC).",
            "items": [
                {
                    "id": 273716,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436338,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Screen_Shot_2016-01-11_at_5.35.14_PM_print.jpg",
                        "filename": "Screen_Shot_2016-01-11_at_5.35.14_PM_print.jpg",
                        "media_type": "Image",
                        "alt_text": "Impromptu speech following the ribbon cutting of the Robotic Operations Center (ROC).",
                        "width": 1024,
                        "height": 570,
                        "pixels": 583680
                    }
                },
                {
                    "id": 273712,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436336,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Screen_Shot_2016-01-11_at_5.35.14_PM.png",
                        "filename": "Screen_Shot_2016-01-11_at_5.35.14_PM.png",
                        "media_type": "Image",
                        "alt_text": "Impromptu speech following the ribbon cutting of the Robotic Operations Center (ROC).",
                        "width": 2522,
                        "height": 1406,
                        "pixels": 3545932
                    }
                },
                {
                    "id": 273717,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436339,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Screen_Shot_2016-01-11_at_5.35.14_PM_searchweb.png",
                        "filename": "Screen_Shot_2016-01-11_at_5.35.14_PM_searchweb.png",
                        "media_type": "Image",
                        "alt_text": "Impromptu speech following the ribbon cutting of the Robotic Operations Center (ROC).",
                        "width": 320,
                        "height": 180,
                        "pixels": 57600
                    }
                },
                {
                    "id": 273718,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436340,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Screen_Shot_2016-01-11_at_5.35.14_PM_web.png",
                        "filename": "Screen_Shot_2016-01-11_at_5.35.14_PM_web.png",
                        "media_type": "Image",
                        "alt_text": "Impromptu speech following the ribbon cutting of the Robotic Operations Center (ROC).",
                        "width": 320,
                        "height": 178,
                        "pixels": 56960
                    }
                },
                {
                    "id": 273719,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436341,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Screen_Shot_2016-01-11_at_5.35.14_PM_thm.png",
                        "filename": "Screen_Shot_2016-01-11_at_5.35.14_PM_thm.png",
                        "media_type": "Image",
                        "alt_text": "Impromptu speech following the ribbon cutting of the Robotic Operations Center (ROC).",
                        "width": 80,
                        "height": 40,
                        "pixels": 3200
                    }
                },
                {
                    "id": 273713,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436337,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Senator_Barbera_Mikulski_Speech.mov",
                        "filename": "Senator_Barbera_Mikulski_Speech.mov",
                        "media_type": "Movie",
                        "alt_text": "Impromptu speech following the ribbon cutting of the Robotic Operations Center (ROC).",
                        "width": 1280,
                        "height": 720,
                        "pixels": 921600
                    }
                },
                {
                    "id": 273720,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 436342,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Senator_Barbera_Mikulski_Speech.webm",
                        "filename": "Senator_Barbera_Mikulski_Speech.webm",
                        "media_type": "Movie",
                        "alt_text": "Impromptu speech following the ribbon cutting of the Robotic Operations Center (ROC).",
                        "width": 1280,
                        "height": 720,
                        "pixels": 921600
                    }
                },
                {
                    "id": 273714,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 852536,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Senator_Barbera_Mikulski_Speech.en_US.srt",
                        "filename": "Senator_Barbera_Mikulski_Speech.en_US.srt",
                        "media_type": "Captions",
                        "alt_text": "Impromptu speech following the ribbon cutting of the Robotic Operations Center (ROC).",
                        "label": "English",
                        "language_code": ""
                    }
                },
                {
                    "id": 273715,
                    "type": "media",
                    "extra_data": null,
                    "title": null,
                    "caption": null,
                    "instance": {
                        "id": 852537,
                        "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012100/a012115/Senator_Barbera_Mikulski_Speech.en_US.vtt",
                        "filename": "Senator_Barbera_Mikulski_Speech.en_US.vtt",
                        "media_type": "Captions",
                        "alt_text": "Impromptu speech following the ribbon cutting of the Robotic Operations Center (ROC).",
                        "label": "English",
                        "language_code": ""
                    }
                }
            ],
            "extra_data": {}
        }
    ],
    "studio": "gms",
    "funding_sources": [
        "PAO"
    ],
    "credits": [
        {
            "role": "Producer",
            "people": [
                {
                    "name": "Michelle Handleman",
                    "employer": "USRA"
                }
            ]
        },
        {
            "role": "Editor",
            "people": [
                {
                    "name": "Michael Randazzo",
                    "employer": "Advocates in Manpower Management, Inc."
                }
            ]
        },
        {
            "role": "Videographer",
            "people": [
                {
                    "name": "John Caldwell",
                    "employer": "Advocates in Manpower Management, Inc."
                },
                {
                    "name": "Michael McClare",
                    "employer": "HTSI"
                }
            ]
        }
    ],
    "missions": [],
    "series": [],
    "tapes": [],
    "papers": [],
    "datasets": [],
    "nasa_science_categories": [],
    "keywords": [
        "HDTV"
    ],
    "recommended_pages": [],
    "related": [
        {
            "id": 12092,
            "url": "https://svs.gsfc.nasa.gov/12092/",
            "page_type": "Produced Video",
            "title": "NASA’s Webb Space Telescope Receives First Mirror Installation",
            "description": "Produced Video showing engineers in the NASA Goddard Space Flight Center cleanroom placing the first mirror on the Webb Telescope. || VSS-Webb_Telescope_First_Mirror-image_only_print.jpg (1024x576) [209.6 KB] || VSS-Webb_Telescope_First_Mirror-image_only_searchweb.png (320x180) [117.2 KB] || VSS-Webb_Telescope_First_Mirror-image_only_web.png (180x320) [117.2 KB] || VSS-Webb_Telescope_First_Mirror-image_only_thm.png (80x40) [7.9 KB] || VSS-Webb_Telescope_First_Mirror_Installation-h264.mov (1280x720) [70.8 MB] || VSS-Webb_Telescope_First_Mirror_Installation-ProRes-master.mov (1920x1080) [1.1 GB] || VSS-Webb_Telescope_First_Mirror_Installation-h264.webm (1280x720) [8.9 MB] || VSS-Webb_Telescope_First_Mirror_Installation-srt-ccaption.en_US.srt [1017 bytes] || VSS-Webb_Telescope_First_Mirror_Installation-srt-ccaption.en_US.vtt [1.0 KB] || ",
            "release_date": "2015-12-03T11:00:00-05:00",
            "update_date": "2023-05-03T13:49:04.382454-04:00",
            "main_image": {
                "id": 437068,
                "url": "https://svs.gsfc.nasa.gov/vis/a010000/a012000/a012092/VSS-Webb_Telescope_First_Mirror-image_only_print.jpg",
                "filename": "VSS-Webb_Telescope_First_Mirror-image_only_print.jpg",
                "media_type": "Image",
                "alt_text": "Produced Video showing engineers in the NASA Goddard Space Flight Center cleanroom placing the first mirror on the Webb Telescope.",
                "width": 1024,
                "height": 576,
                "pixels": 589824
            }
        },
        {
            "id": 11972,
            "url": "https://svs.gsfc.nasa.gov/11972/",
            "page_type": "Produced Video",
            "title": "Goddard Scene Setters",
            "description": "Goddard Space Flight Center broll Updated 2022 || Screen_Shot_2022-07-11_at_9.44.24_AM_print.jpg (1024x568) [236.5 KB] || Screen_Shot_2022-07-11_at_9.44.24_AM.png (2814x1562) [7.1 MB] || Screen_Shot_2022-07-11_at_9.44.24_AM_searchweb.png (320x180) [132.5 KB] || Screen_Shot_2022-07-11_at_9.44.24_AM_web.png (320x177) [131.4 KB] || Screen_Shot_2022-07-11_at_9.44.24_AM_thm.png (80x40) [11.2 KB] || Goddard_CenterBroll22Final.mov (1920x1080) [7.9 GB] || Goddard_CenterBroll22FinalLowres.mp4 (1920x1080) [996.5 MB] || Goddard_CenterBroll22FinalLowres.webm (1920x1080) [63.0 MB] || ",
            "release_date": "2015-08-12T11:10:00-04:00",
            "update_date": "2023-05-03T13:49:29.058512-04:00",
            "main_image": {
                "id": 441072,
                "url": "https://svs.gsfc.nasa.gov/vis/a010000/a011900/a011972/YOUTUBE_HQ_GoddardSceneSetters_youtube_hq_print.jpg",
                "filename": "YOUTUBE_HQ_GoddardSceneSetters_youtube_hq_print.jpg",
                "media_type": "Image",
                "alt_text": "NASA Goddard Scene Setters.  Includes shots of the main gate, the rocket garden, Building 29 exterior, Building 32 exterior, and a Goddard sign by the Space Environment Simulator.",
                "width": 1024,
                "height": 576,
                "pixels": 589824
            }
        },
        {
            "id": 11856,
            "url": "https://svs.gsfc.nasa.gov/11856/",
            "page_type": "B-Roll",
            "title": "Hubble's 25th Anniversary Resource B-Roll Collection",
            "description": "Best of Hubble Broll includes launch and deploy, and Extravehicular Activity. || Screen_Shot_2015-04-16_at_5.33.09_PM.png (1616x903) [1.6 MB] || Screen_Shot_2015-04-16_at_5.33.09_PM_print.jpg (1024x572) [127.2 KB] || Screen_Shot_2015-04-16_at_5.33.09_PM_web.jpg (319x178) [19.9 KB] || Screen_Shot_2015-04-16_at_5.33.09_PM_searchweb.png (320x180) [87.4 KB] || Screen_Shot_2015-04-16_at_5.33.09_PM_web.png (320x178) [86.5 KB] || Screen_Shot_2015-04-16_at_5.33.09_PM_thm.png (80x40) [8.2 KB] || Best_of_Hubble_appletv.m4v (960x540) [322.7 MB] || Best_of_Hubble_youtube_hq.mov (1280x720) [1.0 GB] || Best_of_Hubble_1280x720.wmv (1280x720) [395.9 MB] || Best_of_Hubble_prores.mov (1280x720) [11.6 GB] || Best_of_Hubble_youtube_hq.webm (1280x720) [84.8 MB] || Best_of_Hubble_720x480.wmv (720x480) [366.8 MB] || Best_of_Hubble_ipod_lg.m4v (640x360) [126.5 MB] || Best_of_Hubble.mov (640x360) [322.1 MB] || Best_of_Hubble_nasaportal.mov (640x360) [322.1 MB] || Best_of_Hubble_ipod_sm.mp4 (320x240) [67.5 MB] || ",
            "release_date": "2015-04-20T00:00:00-04:00",
            "update_date": "2023-05-03T13:49:46.742589-04:00",
            "main_image": {
                "id": 443890,
                "url": "https://svs.gsfc.nasa.gov/vis/a010000/a011800/a011856/beautiful_hubble_2_youtube_hq_print.jpg",
                "filename": "beautiful_hubble_2_youtube_hq_print.jpg",
                "media_type": "Image",
                "alt_text": "Montage of Hubble Images.",
                "width": 1024,
                "height": 576,
                "pixels": 589824
            }
        },
        {
            "id": 11521,
            "url": "https://svs.gsfc.nasa.gov/11521/",
            "page_type": "Produced Video",
            "title": "Webb Telescope Deployment Sequence Close-ups",
            "description": "Animation showing the James Webb Telescope's flight path and deployment sequence. || ",
            "release_date": "2014-04-23T15:00:00-04:00",
            "update_date": "2023-05-03T13:50:58.814375-04:00",
            "main_image": {
                "id": 456393,
                "url": "https://svs.gsfc.nasa.gov/vis/a010000/a011500/a011521/JWST_2014_deploy-IMAGE_ONLY_web.png",
                "filename": "JWST_2014_deploy-IMAGE_ONLY_web.png",
                "media_type": "Image",
                "alt_text": "Animation showing the James Webb Telescope's flight path and deployment sequence.",
                "width": 180,
                "height": 320,
                "pixels": 57600
            }
        }
    ],
    "sources": [],
    "products": [],
    "newer_versions": [],
    "older_versions": [],
    "alternate_versions": []
}